, offers the complete turnkey consultancy covering the complete spectrum of the service mentioned in the our services. SG Associates, works in close co-ordination with the client right from conceiving the idea of setting up a pharmaceutical facility up to the commissioning of it.

Schedule of Fees

For Turnkey Consultancy Services

The fees shall be 5%(Five Percent) based on the cost of investments scoped above. This includes costs of Civil, Structural, Architectural, Air-conditioning (HVAC), Electrification, Utilities such as Steam, Pneumatic, Water treatment plants, Piping, N2, O2, LPG, DW, CIP, SIP system, DM Plants and any such utilities, Pharmaceuticals Machines, Fabrication etc.

And 2% ( Two Percent ) for pharmaceutical engineering i.e. Pharma layout, Man   Material Movement, Room Data sheet, Pharma Machine Layout etc.

Taxes
Taxes and Other Levies will be charged extra as applicable.

Bank Charges
Bank Charges shall be paid extra by the client.

Visiting Charges
Visiting charges shall be payable at US $500 per visit per day per person over & above the actual expenditure made on Air Fare, Ist Class Lodging & boarding, conveyance, visa charges, Air Port Taxes etc. from Indore H.O. (INDIA) to site in the client's country or other countries.

For visit to the collaborator / Supplier / Contractor other than present in the city of site location, the client would arrange free of cost Travel by Air, Ist Class Lodging & boarding, conveyance, visa charges, Air Port Taxes etc.
 

The Terms of payment would be on the Estimated Cost of the Project as under:

a) ADVANCE with L.O.I. 25% of fees on estimated project cost.
b) On preparation of Master site plan & Preliminary Drawing and Design Qualification of Engineering related activities. 10% of fees on estimated project cost.
c) On preparation of Internal layout, Plan, elevation & Major Tender of Civil & MEP Work. 5% of fees on estimated project cost.
d) 50% of the actual cost of the project to be equally divided as per project schedule, which is to be paid on the 1 week of the concurrent month i.e. Suppose 10 month is the period from construction to implementation, the client would pay 5% every month. 50% of fees on actual cost of project
e) On completion of project 10% ± Difference of estimated and actual project cost (If any).


The client would pay Air Fare, Ist Class Lodging & Boarding, Conveyance, Visa Charges, Air Port Taxes etc. for visit for Machine Selection, Exhibition, Machine Inspection, Testing or any other activity related to the project.
 

Responsibility of the Client

  • Providing basic requirements of productions, capacity, products and level of compliance's and automation desired.

  • Location and Site Plan boundaries only, with location of existing facility.

  • Arranging a local Architect for providing necessary information about local conditions in terms of building, electrical and environmental code, day to day supervision , laisioning and preparing submission drawing for approval from all authorities & statutory bodies.

  • Strictly following execution and approved drawings, specifications and recommendations provided by SG Associates in order to achieve required objective of the project.

  • Providing local codes of creating any building.

  • Timely, decision for timely completion of the project.

  • Providing lodging, boarding, local conveyance, out of pocket expenses, medical, travelling and Visa Expenses along with any taxes applicable to SG Associates for Directors & personnel visiting to the project.

  • In case of arranging a full time project engineer from SG Associates, the salary and other expenses i.e. Family Accommodation, Food, Lodging ,Boarding, Medical, LTA, Leave, Local Conveyance, Out of Pocket Expenses, Travelling, Visa Expenses and other facilities which are provided to the personnel as per local code will be borne by the client.

  • Providing office assistance along with facilities like communication by Phone, Fax and e-mail, stationary and other requirement pertaining to the project. The client will also have to provide an assistant to our engineer/directors during their stay as per their requirement.

 